EIA (MIA) & ETJ
Federal & state environmental impact
ZOFEMAT
Concessions & official demarcation
POET & PDU
Land-use zoning & alignment
100%
Alignment & favorable rulings
At ICCSSA (Civil and Coastal Engineering of the Southeast), we turn regulatory complexity into operational certainty and technical viability. We help real estate developers, investment funds, and industrial parks structure sustainable, fully compliant projects within Mexico's environmental and urban legal frameworks—tightly integrating civil and coastal engineering with Environmental Impact Assessments (MIA), Preventive Reports (SDS00-13), Urban-Environmental Feasibility (FUA), and ZOFEMAT concessions.
Specialized scopes and filings in environmental & urban permitting
1. Environmental Impact Assessments (MIA) before SEMARNAT and SDS
Comprehensive preparation, filing, and technical defense of Particular and Regional Environmental Impact Assessments (MIA) before Mexico's Ministry of Environment and Natural Resources (SEMARNAT) and Yucatán's SDS. We integrate biotic flora and fauna inventories, Social Impact Assessments (EVIS), sanitary engineering with wastewater treatment plant (WWTP / PTAR) design, Technical Justificative Studies for Forestry Land-Use Change (ETJ-CUSTF), and technical follow-up on official resolutions.
2. Federal Maritime-Terrestrial Zone (ZOFEMAT) concessions & filings
Georeferenced topographic demarcation of the Federal Maritime-Terrestrial Zone (ZOFEMAT), boundary surveys for land reclaimed from the sea, new concession filings, renewals, transfers of rights, permit modifications, and environmental authorizations for coastal protection and beach access works across Yucatán and Quintana Roo.
3. State & municipal permits: SDS Preventive Report and FUA
Specialized preparation of Environmental Preventive Reports (filing SDS00-13 before Yucatán's Ministry of Sustainable Development (SDS)), backed by UAV drone photogrammetry and georeferenced orthomaps; plus Urban-Environmental Feasibility (FUA) filings before IMDUT in coordination with SDS and municipal urban development offices, verifying compliance with POETY and PMDU, hydraulic infrastructure, and roadway access for building permits.
4. On-site environmental supervision & compliance
Environmental auditing and monitoring during construction and operation: systematic tracking of SEMARNAT and SDS permit conditions, design and execution of Environmental Surveillance Programs (PVA), flora rescue and wildlife relocation, periodic water quality monitoring, and specialized technical support during PROFEPA inspections.
The ICCSSA advantage: engineering and regulatory teams under one roof
In most projects, there is a critical disconnect between environmental consultants and design/construction engineers—causing agency observations, work suspensions, or permit conditions that are unfeasible to build.
At ICCSSA (Civil and Coastal Engineering of the Southeast), we eliminate that risk: the exact multidisciplinary team performing topographic surveying, bathymetry, and numerical hydrodynamic modeling builds the technical dossier for SEMARNAT, PROFEPA, or state authorities. This ensures robust submissions, buildable permit conditions, and faster institutional approvals.
Our commitment is to protect your investment through strict engineering alignment with federal, state, and municipal environmental law.

Case studies and flagship projects
Need environmental advisory or permitting regularization for a development?
Consult with our engineers and regulatory specialists to evaluate your parcel or project and design an efficient permitting roadmap.




